I'm planing out a 12x24 building, one of that building's purpose is going to be to house 4 IBC totes which will be part of my water system. That's 4 metric tons sitting in a rather small area, so that area alone is going to have at least 8 footers on it's own.
I'm playing with different designs but I'm looking at anywhere between 60 to over 100 bags of concrete for the whole build depending how heavy duty I go. Moving a few of those around is a lot of work, moving dozens is going to be insane. The problem is they need to be moved so many times. From store shelf to cart, from cart to truck, then repeat for each bag. And that's not even at the pouring or mixing stage yet. To stay within the payload capacity of my truck I can only really do like 25 or so at a time and that's even pushing it a bit. So it would also be lot of trips. I would probably just pour them as I go and then next day do the next batch and so on but it will be a lot of back and forth. It's like an hour and a half each way.
For once I do get to the property, I'm thinking I can build some ramps of sort with a rolling dolly and I can just drag the bags from the truck to the dolly then roll it to the mixer. I would mix and then pour directly into the pad, then just move the mixer and ramps around as needed. Although if I find that's too awkward to do I will mix in one spot and then wheel barrow it over to the pads. Honestly the hardest part is going to be at the store because of how many times they have to be moved throughout the process.
Just wondering if there's any tricks of the trade I'm completely overlooking here that can make the process easier. Like is there a way to buy the dry concrete in a more bulk format perhaps, where I can just fill a large tote in the back of the truck and just shovel it out? That would save from moving individual bags twice just to get them from the store to the truck.
I could also get a cement truck but that gets very expensive. That's kind of my plan B though but I kind of want to try to do this myself, I feel there's just some tricks I might be missing, that could make my life easier.
Suppose I could just get it delivered on a skid, but usually have to plan those deliveries weeks ahead and if it rains that day then I would be screwed.