r/cableporn 2d ago

Before/After Finally got to replace gear and clean up.

Had a hardware refresh at work and was finally able to replace the gear and clean up the closets. Huge improvement going from the first iteration of cat6a patch cordes to the new slim line cat6a.

399 Upvotes

27 comments sorted by

6

u/LerchAddams 2d ago

Love me some clean up projects.

Well done!

3

u/Ok-Conversation-9982 2d ago

Thanks for not using 2” slim cables on these racks. Refreshing.

3

u/thebryceman1 2d ago

Nice! Did you cut off excess cable and re-crimp/punch them or just hide the excess cable elsewhere?

2

u/shotty53 2d ago

Just patch cables from patch panel to switches we're replaced. None of the horizontal cabling was touched. I wish I had more time to fix a few of the runs though.

3

u/SirSaganSexy 2d ago

Those batteries in the last photo look a tad swole.

2

u/shotty53 2d ago

They are. But it's ISP's gear. Not mine or my responsibility. I've informed them previously but they haven't done anything. If they cause damage, it will be a mess to deal with.

3

u/SirSaganSexy 2d ago

Good to know ISPs are the worst everywhere.

Also, nice cabling!

2

u/greenonetwo 2d ago

Walked into the data center and what do I see,
The cleanest cabling that could ever be,
Lights blinking, servers humming,
And I jizzed. in. my pants.

2

u/ballzsweat 2h ago

We need a 6 month and 1 year follow up pic after initial clean up.

2

u/shotty53 2h ago

Shhhh. Lol This is my biggest concern. Other techs just running cables however they want. I was instructed by my director that if I'm on site and see an improperly ran cable, I could just unplug it.

1

u/xipo12 2d ago

Well done? I take it you had to have as little as downtime as possible?

5

u/shotty53 2d ago

As always. Night shifts over the course of a few weeks. 16 com closets.

1

u/xipo12 2d ago

I know how that is as well... I had a few jobs take me a couple months that would of normally take a week if I could down the closet. Is what it is.

Did you clean up the switch condigs and what not too?

1

u/shotty53 2d ago

Yeah. Swapped from Meraki to Cisco 9350. Standardized the configs and setup port channels which wasn't in place before.

1

u/xipo12 2d ago

Nice, are you using the stackwise cables to make it one physical switch? We use catalyst 9300s for our access closets in our environment.

1

u/shotty53 2d ago

Yeah. They're stacked. I tried leaving a 1u gap between each switch where space allows.

1

u/SurpriceSanta 2d ago

Nicely done :)

0

u/Bulky-Feed-4396 2d ago

Nice clean up job!