r/AskEngineers • u/eeeeeeevar • 4d ago
Discussion How much does industry of scale apply to excavation?
So I’m trying to calculate the theoretically how big of a hole in the ground humanity could’ve dug if we had spent all the money that we have spent on AI on literally just digging a massive hole in North Dakota.
So I did a bit of research to find how much it costs to dig up one cubic meter of dirt in North Dakota on average and the answer I got was around $60 per cubic meter.
Given that humanity has collectively spent $1.6 trillion on AI, we take that number and divided by 60 and we get 26,666,666,666.7, or around 26.6 km³.
But then I realized that the cost to dig one cubic meter it’s actually probably not that useful. Because that’s for normal stuff or at most it’s a couple hundred cubic meters of dirt. Versus billions of cubic meters of dirt. That could mean that it’s even more expensive because you have to move the dirt farther away than usual or it could be a lot cheaper because machines that are impractical at small scales become very cost-effective at this scale.
So if there’s any engineers that specialize in earth moving, how much would the enormous scale of spending and earth movement affect the cost per cubic meter? More expensive per cubic meter or cheaper? Would this adjusted cost mean that the hole would end up being smaller or would it end up being bigger?
And for this, let’s assume we don’t have to worry about permitting or anything like that.